Public Works & Mobility Fee Schedules:

ENGINEERING Description
2024 FEE
Engineering Site Plan Review for Bldg Permits:

Miscellaneous small structure plan check (sheds, shops, pole barns, sign bases taking 30 minutes or less)
 $78.00 
Single-family residential plan check (<5% slope) 
 $167.00 
Single-family residential plan check (5-10% slope)
 $221.00 
Single-family residential plan check (>10% slope) 
 $270.00 
Multi-family residential plan check 2-4 units
 $190.00 
Multi-family residential plan check 5-20 units
 $292.00 
Multi-family residential plan check 21-50 units
 $439.00 
Multi-family residential plan check 51 units and greater:
 $595.00 
Commercial/industrial plan check 0-20,000 square feet
 $292.00 
Commercial/industrial plan check 20,001-100,000 square feet
 $365.00 
Each additional 20,000 sf (in addition to base fee)
 $561.00 
Improvement Agreements:

Improvement Agreement for Subdivisions and Townhome Exemption Developments (TEDs)  
 $275.00 
Improvement Agreement for Subdivision Exemption Affidavits (SEAs)
 $446.00 
PWI Resubmittal (Stage Process):

Resubmittal of Final Design Package
 $1,878.00 
Resubmittal of Preliminary Design Package
 $2,794.00 
Misc. Engineering Fees

Maps
 $5.00 



RIGHT OF WAY USE AND CONSTRUCTION / PRIVATE PAVINGDescription
2024 FEE
ROW Vacation and Easement Release:

ROW Vacation
 $2,739.00 
Easement Release
 $550.00 
ROW Curb & Gutter Construction

ROW curb / gutter  (Remove/Replace/Install)

0-30 LF = $286
31-250 LF = $801
251-1000 LF = $1210
each LF exceeding 1000 is an additional $0.24
ROW curb / gutter Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same cost as original permit cost
ROW Sidewalk & Driveway Approach Construction:

ROW sidewalk / driveway approach (Remove/Replace/Install)
0-150 SF = $270
151-500 SF = $721
501-1000 SF = $910
each SF exceeding 1000 is an additional $0.25
ROW sidewalk /  driveway approach Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same cost as original permit
ROW Repairs - included but not limited to work such as grinding, crack sealing, saw cutting and mudjacking

ROW RepairsIncluded but not limited to work such as grinding, crack sealing, saw cutting, and mudjacking.0-30 SF = $133
31-250 SF = $360
251-1000 SF = $454
each SF exceeding 1000 is an additional $0.15
ROW Construction Project Administration & Management (in addition to inspection fees):

Design Construction Admin Fee based on type of project: 
 
Additional important informationA. type project charged at 3%,  B. type project charged at 9%, C. type project is charged at 19%
ROW Occupancy Permits (Plan check and inspection):

Up to 30 days occupancy
 $88.00 
Up to 90 days occupancy
 $177.00 
ROW OCCUPY INVESTIGATION FEE 30Investigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same cost as original permit
ROW OCCUPY INVESTIGATION FEE 90Investigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same cost as original permit
ROW Encroachment Permits:

Miscellaneous small encroachment plan review: (signs, awnings, railings, stairs, landings, balconies, eaves, etc. attached to the building  with review taking 30 minutes or less)
 $78.00 
Structures, detached signs, etc.
 $170.00 
ROW Paving Construction Work 

Roadway/street and / or alley paving If both Private paving and ROW paving are required, only a ROW Permit will be required. The ROW permit will combine the footage for both Private and ROW paving.0-2000 SF  = $182
2001-50,000 SF = $547 
each SF exceeding 50,000 is an additional $.022
City Sidewalk Project
BASED ON PROJECT FOOTAGES
Paving Construction Work for Private Property

Single-family residential
 $182.00 
Multi-family/commercial - up to 2,000 square feet
 $525.00 
Multi-family/commercial - 2,001 to 50,000 square feet
 $547.00 
Multi-family/commercial greater than 50,000 sf
$547  plus 0.022 for every SF exceeding 50000 sf
Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same cost as original permit



ADA
2024 FEE
Accessibility Standards (ADA) - New Construction:

New Construction of Parking Lot
0-12000 SF = $526
12000-42000 SF = $607
42000 SF and greater is $737.
Accessibility Standards (ADA) - Maintenance

Parking lot striping. 
 $172.00 
Accessibility Standards - Reconstruction (paving, repaving or reconstruction):

Reconstruction (paving, repaving or reconstruction
0-2,000 SF = $525 
2,001-50,000 SF = $546
Each sf exceeding 50,000 SF is an additional $.022



ASPHALT PENALTIES
2024 FEE
Asphalt Penalties - Arterial Streets:

Asphalt age is 2 years or less
 $22.50 
Asphalt age is between 2 years and 5 years 
 $17.10 
Asphalt age is between 5 years and 10 years 
 $11.80 
Chip Seal (seal coat) age is less than 5 years  
 $8.60 
Asphalt Penalties - Collector Streets:

Asphalt age is 2 years or less
 $17.10 
Asphalt age is between 2 years and 5 years 
 $13.90 
Asphalt age is between 5 years and 10 years 
 $8.60 
Chip Seal (seal coat) age is less than 5 years  
 $4.30 
Asphalt Penalties  - Local Streets:

Asphalt age is 2 years or less
 $11.80 
Asphalt age is between 2 years and 5 years 
 $9.60 
Asphalt age is between 5 years and 10 years 
 $4.30 
Chip Seal (seal coat) age is less than 5 years  
 $1.10 



EXCAVATION 
2024 FEE
Excavation: New Utility Mains for Sewer, Water and Storm:

Utility main construction
0-600  LF = $3352 
601-2400 LF = $4929
Each LF exceeding 2400 is an additional $0.61 per LF
Excavation: New Dry Utility Mains (gas, electric, fiber-optic, telephone and cable television)

Utility main construction: 0-300 lineal feet
 $468.70 
Cost per lineal foot exceeding 300 feet (trenching)
 $1.48 
Cost per lineal foot exceeding 300 feet (boring)
 $0.79 
Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.
Misc. Excavation Permits

Repair Gas Service
 $308.00 
New Gas Service
 $308.00 
Repair Buried Cable service
 $308.00 
New Buried Cable Service
 $308.00 
Repair Other Service
 $308.00 
New Other ServiceMonitoring Wells, Potholing, Joint Utility Service (trench shared by more than one dry utility service) $308.00 
Main Repair (minor)
 $308.00 
Dry Well / Sump  
 $170.00 



SEWER
2024 FEE
Sewer Service Fees

New connection of a service line from the sewer main to the building
 $591.00 
Service stub line from the sewer main to the property line
 $591.00 
New connection of a service line from the stub to the building
 $509.00 
New STEP connection from the sewer main to the building
 $899.00 
Step-Service stub line from the sewer main to the property line
 $591.00 
New STEP connection from the stub to the building
 $834.00 
New STEP tank installation without connection to a sewer main
 $704.00 
Repair to Sewer Service Line
 $308.00 
Utility Service contract (recording fees)
 $121.00 
Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same cost as original permit
Sewer Loan Fee
 $49.00 
Development/Transportation Impact FeesCharged on new development utility connections in the county.See impact fee table
Sewer Connection Fees

Mullan Build (sewer)
As per resolution
Latecomers Agreement Fee
Project specific + 5% administrative fee
Main Connect Fee
$25.00 per LF
West Reserve Sewer Stub Fee
$35 per LF of stub plus $246 for original permit
Mullan Rd Corridor Sewer Project Fee 
$1488.02 per capacity unit
Sewer Development Fees

3/4-inch meter SDFAdditional important information $2,576 
1-inch meter SDF $4,294 
1 1/2-inch meter SDF $8,587 
2-inch meter SDF $13,740 
3-inch meter SDF $25,762 
4-inch meter SDF $42,936 
6-inch meter SDF $85,872 
8-inch meter SDF $154,570 
Miscellaneous Sewer Fees

Grease Interceptor Variance Fee
 $212.00 
Delay of Connection to Public Sanitary Sewer upon Property Transfer 
 $137.00 
Hauled Waste Fee
$60 per 1000 gallons
County Wastewater Meter and Radio transmitter Fee
  (additional $500 refundable deposit also req'd)


3/4-inch meter
$450.00 
1-inch meter
$500.00 
1.5-inch meter
$1,000.00 
2-inch meter
$1,200.00 
3-inch meter 
 $3,400.00 
4-inch meter
$4,000.00 
Compost Tipping Fees

Small Load/Cars
 $3.00 
Full pickup truck or trailer under 8 feet
 $10.00 
Trailer over 8 feet
 $18.00 
Dump Truck
 $18.00 
Wasted Food/ Compostable (10 cubic yards)
 $15.00 
Chipped Material (10 cubic yards)
 $10.00 



WATER
2024 FEE
Water Service Fees

New connection of a service line from the water main to the building
 $331.00 
New connection of a service stub from the water main to the property line
 $264.00 
New connection of a service line from the stub to the building
 $264.00 
Water Service Repair
 $308.00 
Utility Service Contract (Recording Fee)Required when connecting to water in the county. $121.00 
Impact Fee
based on square footage, see impact fee table
Water Connection Fees

Water Special Facility Buy In Fee3rd and 7th, Hilton Dental (west of Reserve St., south of 7th St.), Rattlesnake (Dickinson St.)variable by property (contact water utility for cost
Mullan BUILD Special Development Fee
Variable by property
Water Meter Fees 

3/4-inch meterIf a water meter is damaged due to the customer's negligence, as determined by the Missoula Water Section, the customer will be charged for a new meter based on the size of the existing meter. $395.00 
1-inch meter $766.00 
1 1/2-inch meter $967.00 
2-inch meter $1,139.00 
3-inch meter $3,346.00 
4-inch meter $3,912.00 
6-inch meter $6,517.00 
8-inch meter $9,942.00 
Water Development Fees

3/4-inch meter WDFAdditional important information  $2,116.00 
1-inch meter WDF $5,291.00 
1 1/2-inch meter WDF $10,582.00 
2-inch meter WDF $16,931.00 
3-inch meter WDF $33,863.00 
4-inch meter WDF $52,911.00 
6-inch meter WDF $105,822.00 
8-inch meter WDF $169,315.00 
10-inch meter WDF $243,390.00 
Administrative Fee for Semi-Annual  Payments $54.00 
Water Tapping Fees

1-inch service tap on 2"-12" MainThe customer is responsible for the excavation from the point of intended use to the main and restoration of the excavated area to acceptable condition. Missoula Water shall install a service saddle and corporation stop at the main and tap the main. For services larger than two inches, the customer must provide a gate valve at or before the time of the tap. $271.00 
2-inch service tap on 2"-12" Main $271.00 
4-inch service tap on 2"-12" Main $414.00 
6-inch service tap on 2"-12" Main $414.00 
8-inch service tap on 2"-12" Main $414.00 
10-inch service tap on 2"-12" Main $748.00 
12-inch service tap on 2"-12" Main $748.00 
1-inch service tap on 14"-24" Main $366.00 
2-inch service tap on 14"-24" Main  $366.00 
4-inch service tap on 14"-24" Main $677.00 
6-inch service tap on 14"-24" Main $677.00 
8-inch service tap on 14"-24" Main $677.00 
10-inch service tap on 14"-24" Main $1,130.00 
12-inch service tap on 14"-24" Main $1,130.00 
Miscellaneous Water Charges

Staff Assistance Fee (per hour)
 $48.00 
Non-Sufficient Funds (NSF) Check Charge Fee
 $32.00 
Customer-Requested Temporary (less than 8 months) Disconnect Service Fee
 $26.00 
Reconnection Service Fee
 $105.00 
Private Hydrant Inspection and Flow Test Fee
 $107.00 
Loan Processing Fee
 $49.00 



STORMWATER   
2024 FEE
Stormwater Service Fees

New connection of service line
 $308.00 
Repair of service line
 $308.00 
Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.same as original permit



CITY SWPPP
2024 FEE
Stormwater Permit (SWP) -  Erosion Control Site Plan:

Tier 1:  2500 sq. ft <= Disturbance Area< 1 acre Single Family Residence
 $240.00 
Tier 2:  2500 sq. ft <= Disturbance Area< 1 acre Multifamily/Commercial/Industrial
 $295.00 
Tier 3:  Disturbance Area >= 1 acre All projects with a DEQ SWPPP
 $591.00 
Stormwater Permit (SWP)  - Stormwater Management Site Plan:

Low and Medium Priority Sites
 $295.00 
High Priority Sites
 $443.00 
Investigation Fee- No permit
same as original permit
Investigation Fee-Violation
same as original permit



COUNTY UTILITY CONNECTIONS
2024 FEE
County Utility Connection Review:

Review for Connection to City Utility for Property Outside City Limits: New or Existing Single Family Residence or Duplex or Existing Commercial Building
 $343.00 
Review for Connection to City Utility for  Property Outside City Limits: New Commercial Building, Subdivision or Townhome Exemption Development
 $207.00 
Utility Service Review Committee - Engineering Staff Support (each meeting)
 $343.00 



FENCE
2024 FEE
Fence Permits:

Fence Permit (non-encroachment) 
 $70.00 
Fence Encroachment
 $371.00 
Fence Investigation FeeInvestigation fees are charged when work is started without obtaining necessary permits first. Cost is equal to the cost of the permit.Same as original permit



LOCALIZED FEES
2024 FEE
Localized Fees

Hillview Special Improvement Fees
based on recorded doc for parcel
Mullan Area / Sxwtpqyen Area Special Transportation Impact Fee
based on square footage, see impact fee table