Wastewater Projects
These projects include sewer main replacements and other sewer system infrastructure projects to repair old, failing sewer mains or to increase the wastewater system’s capacity. Also included are projects at the Resource Recovery Facility and at Garden City Compost.
For more information, see the Project Contacts shown below or email Andy Schultz, City Engineer for Utilities, at SchultzA@ci.missoula.mt.us or call (406) 552-6758.
Location: Garden City Compost Facility at 1125 Clark Fork Lane
Description: The construction of a new composting facility with biofilter odor controls and a sufficient working apron. Workflow, efficiency, and capacity of the facility will be increased.
Benefits: The City currently operates a transitional facility that it acquired with the purchase of Eko-Compost in November 2016. This facility will provide for future expansions of the wastewater treatment plant and reduce odors from the existing operation.
Project Dates: Construction Summer/Fall 2025 through Summer 2026.
Project Contacts: Chris Fuchs, Utility Engineer, FuchsC@ci.missoula.mt.us or 406-552-6765
- Project Description: Install approx. 800 LF of 8” gravity sewer main in Lower Miller Creek Road to abandon existing STEP Tanks.
- Bid Opening: TBD 2026
- Visit the City of Missoula Construction Project e-Bidding Site
- Project Area Map
- City of Missoula CIP Map
- Lamoreux Preliminary Exhibit
- Project Description: Install approx. 400 LF of 8” gravity sewer main in Big Fork Road to abandon existing STEP Tanks.
- Bid Opening: TBD 2026
- Visit the City of Missoula Construction Project e-Bidding Site
- Project Area Map
- City of Missoula CIP Map
- Maloney Ranch Preliminary Exhibit