When do permits or applications expire?

Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. [105.5]

Time Limit of Application: An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing unless such application has been pursued in good faith or a permit has been issued [105.3.2]

To request an extension  email the permit coordinators at coordinators@ci.missoula.mt.us at least two weeks prior to the expiration of the building permit.

Show All Answers

1. What building codes are currently adopted?
2. Do I need a Building Permit?
3. What type of work does not require a Building Permit?
4. Can I file a complaint about the property I am renting?
5. Do I have to get a permit to construct or repair a fence?
6. Do I have to hire a contractor?
7. Do my building plans have to be drawn by an architect or engineer?
8. What inspections do I need to schedule?
9. How do I check the results of an Inspection?
10. How do I schedule an inspection?
11. What is the building inspection jurisdiction?
12. Do I need a permit for demolition?
13. Do I need an electrical, mechanical or plumbing permit?
14. Do I need a moving permit?
15. What is the Voluntary Residential Inspection Program (VRIP)?
16. When do permits or applications expire?