Scott Street Bridge Reconstruction

Project Summary
  • Bridge originally built in 1979
  • Currently structurally sound, but surface shows signs of deterioration
  • Repair now prevents a larger, more expensive project later
  • Remove and replace deck over center two spans
  • Replace concrete overlay with latex concrete overlay on the rest of the bridge
  • Funded by American Recovery and Reinvestment Act funds ("stimulus money")
Timeline
Construction began July 13, 2009 and the bridge reopened in late October 2009.

Contact Information
This is a Montana Department of Transportation project, not a project by the City of Missoula. The construction contract was awarded to Sletten Construction of Great Falls.

Problems and Complaints
Call Sletten Construction toll-free 877-477-1292 between 7 a.m. and 6 p.m. Calls will be returned as soon as possible.

Project Questions
Sletten Construction Chad Mares 406-454-6404
Sletten Construction Dan Frank 406-788-9044
Montana Department of Transportation Dean Jones 406-523-5823